|
|
|
|
|
Fair ~ High: 89°F ~ Low: 67°F Wednesday, June 19, 2013 |
|
Work begins
Damian Erzfeld, an employee for Schemel and Tarrillion Company of Perryville, scrapes the second floor ceiling of the old First Baptist Church. To remove the all the asbestos from the building before its demolition, the company will have to scrape all the ceilings in the building, pull up tile and tile glue from floors, and clean all the insulation off pipes.
© Copyright 2005 Sikeston Standard Democrat. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.
|
|