|
|
|
|
|
Partly Cloudy ~ High: 87°F ~ Low: 71°F Monday, May 20, 2013 |
|
Sidewalk repair
Josh McClendon, a city of Sikeston Public Works employee, levels ground Tuesday afternoon. The city is repairing the sidewalk in the 800 block of Sikes.
© Copyright 2005 Sikeston Standard Democrat. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.
|
|